Поиск по каталогу |
(строгое соответствие)
|
- Профессиональная
- Научно-популярная
- Художественная
- Публицистика
- Детская
- Искусство
- Хобби, семья, дом
- Спорт
- Путеводители
- Блокноты, тетради, открытки
Implementing of Cost and Profit Management Systems:. A case of small, medium and large Construction firms in Swaziland
В наличии
Местонахождение: Алматы | Состояние экземпляра: новый |
Бумажная
версия
версия
Автор: Sihle Shabangu,Rosemary Sibanda and Ankit Katrodia
ISBN: 9786139872534
Год издания: 2018
Формат книги: 60×90/16 (145×215 мм)
Количество страниц: 84
Издательство: LAP LAMBERT Academic Publishing
Цена: 24061 тг
Положить в корзину
Позиции в рубрикаторе
Сферы деятельности:Код товара: 209021
Способы доставки в город Алматы * комплектация (срок до отгрузки) не более 2 рабочих дней |
Самовывоз из города Алматы (пункты самовывоза партнёра CDEK) |
Курьерская доставка CDEK из города Москва |
Доставка Почтой России из города Москва |
Аннотация: Is there a need for contractors to have cost and profit management systems if such businesses are privately owned with one or more directors with different cultures and beliefs in the running of a business? This case study investigated and compared if the use of cost and profit management systems by large construction firms results in their good performance and if the non-use of these systems results in the failure of small to medium construction firms. This introductory section presents the background to the study. It includes the problem statement, aim of the study, the specific objectives as well as the significance of the study. The study focused on the implementation of cost and profit management systems by small, medium and large construction firms in Swaziland with the aim of evaluating if these systems are effective in the performance and sustainability of the construction firms. Failure to implement such systems also seems to have a direct impact in project execution which in turn the end user client suffers non-delivery, poor quality work or delayed project execution which is a cause on concern.
Ключевые слова: small, Cost, Profit, management systems, medium and large, construction firms